As soon as the stucco was completed in mid-November, we rushed to close-in the house.
Once the vapor barrier was sealed and the ceiling was prepped, we began insulating the attic.
Wishe loaded cellulose into the blower while Will was blowing it into the attic.
We installed about 15 inches of cellulose in the attic to create an R-value of approximately R50.
After the radiant heating was turned on downstairs, the house warmed-up quickly. All our hard work was worth the effort!!
No comments:
Post a Comment